City of Tacoma – RFB – CTP Electrical Distribution System Replacement Project – Due 4/21/2020
City of Tacoma – RFB – CTP Electrical Distribution System Replacement Project
Due Date: April 21, 2020
Pre-Proposal Meeting: A pre-proposal meeting will be held on Wednesday March 25, 2020 at 9:00 AM in the second floor conference room of Building A (Sewer Transmission Building) at the City of Tacoma Central Wastewater Treatment Plant (CTP), 2201 E Portland Ave, Tacoma, WA 98421. A site tour of the treatment plant will follow the meeting. The meeting and site tour may last until 11:00 AM. Plant staff will also be available for additional tours on the following day, Thursday March 26, 2020 from 8:00 AM to 10:00 AM. The purpose of the Pre-Proposal Meeting and tour are to provide a technical project overview, review the City’s SBE and LEAP requirements, provide an opportunity for facility familiarization, and receive project questions.
Project Scope: The CTP Electrical Distribution System Replacement Project will repair, replace, and rehabilitate the entire 15-kilovolt (kV) Medium Voltage (MV) electrical distribution system at the CTP in the City of Tacoma, Washington. The completed project will build over 3,000 lineal feet of concrete encased reinforced duct bank, install over 20 miles of MV feeder cables, construct an approximately 3,400 square foot concrete masonry unit building for protecting and operating the new electrical equipment, and install a new 15-kV switchgear comprised of approximately 40 MV circuit breakers. The Work will take place at a wastewater treatment plant that continuously operates (24 hours per day, 365 day per year). The Work will have to be carefully coordinated to prevent disruptions to plant operation.
Estimate: $18,000,000 to $20,000,000 excluding sales tax