City of Tacoma – RFB – Madison District Green Infrastructure Project – ES21-0004F – Due 7/5/22

City of Tacoma – RFB – Madison District Green Infrastructure Project – ES21-0004F

Due Date: July 5, 11 AM
Pre-Proposal Meeting:
 A pre-proposal meeting will be held via conference call from 11:00 AM – 12:30 PM on June 27th, 2022 to answer questions regarding the project in general as well as the Disadvantaged Business Enterprise Program (DBE) requirements included in the Contract.
Project Scope: The Madison District Green Infrastructure project is replacing approximately 18 blocks of residential roadways between South 43rd Street and South 47th Street and between South Tacoma Way and Pine Street with approximately two standard asphalt blocks and approximately 15 pervious asphalt blocks with ballasted sidewalk. Work also includes replacing 3400LF of Wastewater, replacing or extending 1300LF of Surface Water pipe, and replacing 6400LF and removing 2000LF of Water pipe. Driveways, curb ramps, street trees, and channelization are included as well.
Estimate: $10.5 Million to $11.5 Million

This bid is distributed by the City’s designated plan distributor, ARC Document Solutions, Inc. Please click here for more information