City of Tacoma – RFB WS18-0148F – Deep Creek Pipeline Protection Project – Due Date: 05/15/18

City of Tacoma – RFB WS18-0148F – Deep Creek Pipeline Protection Project

Due Date: 05/15/18 11 AM

Project Scope: Deep Creek Pipeline Protection Project – Create 472 linear feet of new channel involving excavation of approximately 4,100 cubic yards of material excavated along existing water pipeline (protected in place) as indicated on the enclosed plans. Work consists of clearing and grubbing, demolition and removal of existing fencing and structures, furnishing and installation of new fence and gate, installation of temporary construction access points, water and sediment management, channel grading, stockpiling and haul-off of excavated material, furnishing and installation of log structures, furnishing and installation of riprap, furnishing and installation of erosion control matting, and re-vegetation activities.

Pre-Proposal Meeting: A pre-proposal meeting will be held at 10:00 a.m Pacific Time, Thursday, May 3, 2018, at the Tacoma Water Property at 35228 Veazie-Cumberland Rd SE, Enumclaw, WA 98022. The purpose of the pre-bid meeting is to answer questions about this solicitation and any special or technical requirements.