Moore Excavation Inc – Request for Sub-Bids (Gresham, OR) – Local Road Reconstruction Stormwater Repairs Phase 3 – Due 10/29/2019
Moore Excavation Inc – Request for Sub-Bids (Gresham, OR) – Local Road Reconstruction Stormwater Repairs Phase 3
Due Date: October 29, 2019 5:00 PM
Scope: The character of the work is replacing existing pipes, catch basins, installing manholes, and repairing problem areas.The major quantities of work involved in this project are: 1040 LF Storm Drain Pipe – Remove & Replace with PVC Pipe, 27 EA Storm Drain Pipe – Point Repair, 18 EA Remove and Replace Catch Basin, 7 EA Manhole Installation. Specifically Seeking Hauling Services (Trucking), Saw Cutting,