Port of Camas-Washougal – RFB – Marina Fuel Dock Replacement – Due 8/24/21

Port of Camas-Washougal – RFB – Marina Fuel Dock Replacement

Due Date: August 24, 3 PM
Description: The work required for this project will include but not necessarily be limited to, the following:  the construction of a fuel dock with high density polyethylene float system with a steel frame structure.  The General Contractor is to furnish all labor, materials, and equipment to construct the project.
Estimate: $352,920
Pre Bid Meeting: A non-mandatory pre-bid conference and site visit have been set for 2:00pm, August 10, 2021

Click here for more information