Port of Seattle – RFB – North Employee Parking Lot (NEPL) Improvements (Phase 2) – MC-0321189 0 – Due 7/25/23
Due Date: July 25, 2 PM
Pre-Bid Site Tour: Jun 29, 10:00 at SEA Airport
Pre-Bid Meeting: June 28, 10:00 AM on Microsoft Teams
Description: Retrofit an existing rockery retaining wall with a new soldier pile retaining wall approximately 600 LF in length and 8 FT maximum height. Chain link fence will be installed on top of the wall. Provide landscape restoration above the new retaining wall and temporary irrigation with a new point of connection and backflow prevention. Replace electrical feeders to two shelter buildings and entrance guard house located within the parking lot. Replace like-for-like wayfinding signage in the parking lot.