Port of Tacoma – RFB – 2022 Port of Tacoma Building Demolition Program – 071731 – Due 6/7/23
Due Date: June 7, 2PM
Estimated Cost Range: $2,200,000 to $2,400,000, plus Washington State Sales Tax (WSST)
Procurement Summary: The Work required for this Project includes but is not limited to:
Abatement of hazardous materials, site demolition, demolition, removal and disposal of buildings, removal of miscellaneous debris and brush, installation of temporary erosion and sediment control, installation of HMA pavement, capping utilities, disconnecting power, backfilling loading pits with gravel, and filling septic tank with CDF.