Port of Tacoma – RFB – Fabulich Center Lighting Upgrade Floors 3 and 4 – 071644 – Due 6/7/22

Port of Tacoma – RFB – Fabulich Center Lighting Upgrade Floors 3 and 4 – 071644

Due Date: June 7, 2 PM
Procurement Summary: The Work required for this Project includes: Removal and disposal of existing fluorescent light fixtures and bulbs; installation of new LED fixtures, switches, sensors and lighting control system; minor electrical wiring; and programming of the lighting control system for a complete lighting upgrade.
Estimated Cost Range: $360,000 to $400,000, plus Washington State Sales Tax (WSST)