Absher – Request for Sub-Bids – Parrington Hall Renovation – Due 6/14/2019

Absher – Request for Sub-Bids – Parrington Hall Renovation

Due Date: June 14, 2019

Scope: The project consists of a complete interior renovation of the existing Parrington Hall. The intent is to completely reconfigure the existing floor plans to maximize classroom space and faculty offices on Levels 1-3, and also “refresh” and update student lounge spaces at the Basement Level and 4th Floor level. The building is approximately 40,000sf and will consist of select and structural demo, added footings, structural steel framing and new stairs, miscellaneous wood framing, thermal and acoustical insulation, new doors, interior glazing, all new finishes including new drywall, flooring, ceiling finishes, wall finishes, wood paneling, painting, tackable wall coverings, visual display boards, cafe/kitchen equipment, and a retrofit/renovation of MEPF systems.