Flatiron-Lane – RFB – Nelson Shear Stud Furnish and Install – I-405 Renton to Bellevue Express Toll Lanes Project – Due 5/25/21

Flatiron-Lane – RFB – Nelson Shear Stud Furnish and Install – I-405 Renton to Bellevue Express Toll Lanes Project

Bids Due: May 25
Anticipated Schedule of Performance: June 2021 – July 2023
Scope of Work: Furnish and install approximately 11,000 3/4”x6” Welded Shear Studs on Soldier Pile and Soldier Pile Tieback Walls, with an estimated 22 mobilizations. This will require a RAM submittal to be approved before procurement, as well as meet the WSDOT 2018 Amended 2019 Standard Specifications and RFC Plans. Please provide price for the following:
• Mobilizations – per each
• Furnish and installation of Nelson Studs – per each
Networking Event: Flatiron-Lane JV is hosting a virtual networking event for the I-405 Renton to Bellevue Design-Build Project on Thursday, May 20, 2021 at 3:30 PM. Email George Frost for details.

Click here for more information