Flatiron – RFQ – SCWQP: Tunnel Effluent Pump Station – Ballard Conveyance (REBID) PW# 2021-029 – Updated Due 3/27/24
Updated Due Date: March 27, 2 PM
Flatiron is soliciting quotes for the following Divisions and items of work:
For Divisions 01, 02, 03, 05, 06, 07, 08, 09, 10, 11, 14, 21, 22, 23, 26, 27, 28, 31, 32, 33, 34, 40, 41, 43, and 44, including, but not limited to: Shoring/Excavation, Excavation and Handling of Contaminated Material, Grouting, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Lattice Tower System Stainless Steel Framing, Metal Fabrications, Metal Stairs/Railing/Grating, Fiberglass Reinforced Structural Products and Fabrications, Dampproofing and Waterproofing, Firestopping, Hollow Metal Doors and Frames, Floor Access Doors, Overhead Coiling Doors, Glazing, Gypsum Board, Paintings and Coatings, Identification Devices, Panel/Traffic Signage, Fire Extinguishers, Geared Traction Elevators, Fire Protection Systems, Submersible Sump Pumps, Commercial Plumbing Fixtures, Direct-Digital Control System for HVAC, Metal/Fiberglass-Reinforced Plastic (FRP) Ducts, Odor Control Duct Silencer, Electrical – Exterior Underground, Architectural Lighting, Dry-Type Transformers, Motor Control Equipment, Electrical Vehicle Charging Stations, Interior and Exterior Lighting, Fiber Optic Cable Networks, Fire Detection and Alarm, Shoring/Excavation, Dewatering, Stormwater Bypass, Contact Grouting, Aggregate Base, Asphalt/Porous Flexible/Concrete Paving, Fence and Gate, Planting, Microtunneling, FRP Pipe, Railroad Track Construction, Mechanical Piping, Gates/Valves, Control System Equipment, Bridge Cranes, Hoists, Trolleys, and Monorails, Inline Centrifugal Pumps, Drypit Submersible Wastewater Pumps, Fiberglass Reinforced Plastic Tanks, Grease Filter / Mist Eliminator, Activated Carbon Adsorption Odor Control Media, Photographic Documentation, Noise Monitoring, Vibration Monitoring, and Rodent Control and Extermination
Non-DBE Subs/Suppliers: You will be expected to carry a proportionate percentage of 2nd-tier DBE participation with your quote. 2nd-tier DBE participation will be evaluated with your price.
MBE Utilization Requirements 10%, WBE Utilization Requirements 6%