Lydig Construction – Madison Elementary School-Multiple Bid Packages – Due 6/6-7/18
Lydig Construction – Madison Elementary School-Multiple Bid Packages – Due 6/6-7/18
Advertisement for Bids Madison Elementary School
Due Date: June 6 & 7, 2018 (see below)
In accordance with RCW 39.10.380, GC/CM (General Contractor/ Construction Manager) is requesting sealed proposals from contractors for the above referenced scopes of work. The project is to complete Madison Elementary School. The project consists of construction of one elementary school for the Mount Vernon School District and Lydig GC/CM.
Project scopes:
MES 05 – Glazing & Aluminum Systems Due: 6/6/2018 @ 4:00PM
MES 06 – Casework & Finish Carpentry Due: 6/7/2018 @ 2:00PM
MES 07 – Siding & Flashing Due: 6/6/2018 @ 1:00PM
MES 09 – GWB, Metal Framing & Insulation Due: 6/6/2018 @ 1:30PM
MES 10 – Carpet, Tile & Resilient Flooring Due: 6/6/2018 @ 2:30PM
MES 11 – Roofing Due: 6/6/2018 @ 3:00PM
MES 12 – Paint & Wall Coverings Due: 6/6/2018 @ 3:30PM
MES 13 – Landscaping & Irrigation Due: 6/7/2018 @ 3:00PM
Advertisements for bid can also be downloaded here.
Post bid interviews will be held with the successful contractor June 11th and 12th.
Documents may be examined at the following locations beginning around: May 17th, 2018: Lydig Construction – 3180 139th Ave. SE, Suite110, Bellevue Washington 98005
SmartBid link provided by Lydig Construction – Contact Jamie Defranco via Email at:[email protected]. Bid documents can also be obtained by contacting Jamie DeFranco at [email protected].