PCL Construction – ITB – Terminal 5 Gate Complex – Due 2/14/25
Due Date: February 14
Invitation to Bid: PCL encourages bids from all subcontractors and suppliers including Minority, Women-Owned, Veteran, Disabled Veteran, Disadvantage Business Enterprises, and Small Business Enterprise firms for all scopes of work, portions thereof, or combinations thereof. If you require assistance regarding scopes of work, contracts, plans and specifications, pre-qualification, insurance, bonding, SDI, equipment, materials, and related services, please contact our office.
Description of Work: The purpose of the proposed project is to install a new gate complex to replace the existing gate complex at the entrance to Terminal 5. The existing gate complex will be demolished, and the surface will be restored with asphalt to increase the truck queuing area for incoming trucks. Six of the existing scales and process equipment will be decommissioned and relocated to the new gate complex location. The new Terminal 5 gate complex will consist of twelve (12) entrance lanes. Vertical curb islands will be constructed to delineate truck lanes and provide barriers for gate equipment. DBE Goal: 18%
Subcontractor/supplier opportunities include (but not limited to): – Trouble parking Area – Pavement removal, utilities, excavation, concrete foundation, new paving and striping. – In-Gate Area – Includes pavement removal, utilities, excavations structural foundation, scale equipment, paving and striping. – Existing Gate Building – Selective demolition of steel building, saw cutting, concrete removal, excavation, utilities, paving and striping
Union for following trades – Carpenters, Masons, Laborers, Operators All other trades will be union or prevailing wage.