Port of Seattle – RFP – Terminal 91 Berths 6 & 8 Redevelopment – MC-0321202 – Due 12/5/23
Due Date: December 5, 2 PM
Category: Construction
Pre-Bid Meeting:9:00 AM, Nov 14 on Microsoft Teams
Site Tour:1:00 PM, Nov 15 at Pier 90 Site Tour Info Here
Order of Magnitude: $35M-$70M
Utilization Goal:WMBE 5%
Planned redevelopment includes demolition of the existing timber apron; seawall improvements; removal and relocation of existing gangways, floats and boathouse; removal/replacement of existing small office structures; geotechnical ground improvement; and construction of a concrete apron structure along the current alignment.
Additionally, the project includes the removal of failing creosote piles and installation of concrete and steel piles, with an overall decrease in overwater coverage.
The project work also includes utility improvements (stormwater, sanitary sewer, water, electrical), paving, upgraded shore power connections, renewable energy through new solar panel arrays, and a direct connection for vessel sanitary sewer.