Port of Tacoma – RFB – NIM Stormwater Pipe Extension – 071143 – Due 9/4/2019
Port of Tacoma – RFB – NIM Stormwater Pipe Extension – 071143
Due Date: September 4, 2019 2:00 PM
Scope: Assessing subsurface conditions using existing geotechnical data from historical geotechnical reports; Provide recommendations for design of new:
– Shallow foundations,
– RTG runway grade beams,
– Underground utilities,
– Pavement sections,
– Light poles/luminaires, etc.,
– Grading and backfilling with structural fill,
– General dewatering recommendations; and
– Producing a geotechnical engineering design report
Estimate: Estimated cost range is $425,000 to $460,500
For More Information, Click Here