Port of Tacoma – RFB – Wapato Creek Bridge and Culvert Removal – 071198 – Due 7/21/20
Port of Tacoma – RFB – Wapato Creek Bridge and Culvert Removal – 071198
Due date: July 21, 2 PM
Prebid meeting: June 30, 11:30 AM
Summary: Construction of a 70′ precast voided slab bridge on 24-inch drilled shafts, demolition of a 33′ temporary steel I girder bridge on spread footings, removal of existing 96″ culvert earthwork, paving, utility work, stream restoration and plantings.
Estimated Cost Range: $800,000 to $1,000,000, plus Washington State Sales Tax (WSST)