City of Seattle – RFB – Bitter Lake Playfield Athletic Field Lighting Replacement – 2019-001 – Due 6/19/2019

City of Seattle – RFB – Bitter Lake Playfield Athletic Field Lighting Replacement – 2019-001

Due Date: June 19, 2019 2:00 PM

Scope: Elements of the Work include, but are not limited to: Demolish and haul existing flood light poles to Parks designated park facility, demolish and haul floodlights, leave existing conduit in place. Install new floodlight poles, shielded LED floodlights, conduit, wiring, junction boxes. Patch and repair existing pathways and provide landscape restoration.

Estimate: $649,800

For More Information Click Here