City of Tacoma – RFB – South Tacoma Pump Station Wet Well Structural Assessment – ES21-0002F – Due 5/4/21

City of Tacoma – RFB – South Tacoma Pump Station Wet Well Structural Assessment – ES21-0002F

Due Date: May 4, 11 AM
Pre-Proposal Meeting: A pre-proposal meeting will be held at the South Tacoma Pump Station on April 26th, 2021 at 9:00AM to view the site and answer project questions. The site is located within the Tacoma Public Utilities facility, at 3628 S 35th St, Tacoma, WA 98409. A potential bidder must RSVP to [email protected]. See the below map for entrance location, travel route within the Tacoma Public Utility facility, and meeting location.
Project Scope: This work includes, but is not limited to, all associated work and appurtenances necessary, including labor, materials, equipment, and supervision required to bypass pumping the South Tacoma Pump Station, cleaning and inspecting the 48-inch diameter upstream and downstream pipe segments, cleaning the wastewater wet well, and collecting, testing, and patching concrete core samples from the wet well structure.
Estimate: $375,000

This bid is distributed by the City’s designated plan distributor, ARC Document Solutions, Inc. Please click here for more information.