Port of Tacoma – RFB – WUT Crane Power Addition Project – 071417 – Due 5/5/21

Port of Tacoma – RFB – WUT Crane Power Addition Project – 071417

Due Date: May 5, 2 PM
Summary:
The Work required for this Project includes: Establishment of three new crane power connections on the Washington United Terminal; two 13.8KV connections and one 4.16KV connection. Scope of work will be accomplished by modifying existing electrical substation infrastructure and routing power cabling to existing (unused) crane power vaults. Work will also include relocation of one existing power transformer from Husky Terminal 3.
Estimated Cost Range: Estimated cost range is $156,000 to $180,000, plus Washington State Sales Tax (WSST).
Pre-Bid Meeting: A pre-Bid conference and site visit have been set for 4/28/2021 at 11:30am. Conference and The site visit will convene the Port’s Administrative building, Site Tour: located at One Sitcum Plaza and will travel to the site after a brief meeting.

Click here for more information.