Flatiron-Lane JV Quarterly Outreach Event: I-405 Renton to Bellevue D-B Project – Remove 11/12/20

Flatiron-Lane JV Quarterly Outreach Event: I-405 Renton to Bellevue D-B Project

Event Date: November 12, 2PM

Join Flatiron-Lane JV to learn about upcoming opportunities on the I-405 Renton to Bellevue Design-Build Project. The Eventbrite registration is open here: https://www.eventbrite.com/e/i-405-renton-to-bellevue-quarterly-outreach-event-tickets-126002002381 

This $705 million WSDOT design-build project will widen 12 miles of I-405 between Renton and Bellevue. This is a state-funded project with voluntary goals of 10% MBE, 6% WBE, 5% VBE, and 5% SBE.

Some of the Scopes of work listed:
Welding; Lightweight Concrete; Temporary Seeding; Concrete Barrier/Moment Slab; Waterproofing; Bridge Railing; Asphalt Milling; Post-Tensioning; Ground Improvements; High Friction Surface Treatment; Geotechnical Monitoring; Earth Cam/Video; Project Photography; Construction Materials/Consumables (safety equipment/lumber); Support Services (janitorial, security, bio-hazard, catering, porta-johns, trash hauling); Safety Supply; Office Supply