Port of Seattle – RFB – Regulated Material Abatement (RMM) On-Call Portwide 2021-2 – SW-0320760 – Due 7/6/21

Port of Seattle – RFB – Regulated Material Abatement (RMM) On-Call Portwide 2021-2 – SW-0320760

Due Date: July 6, 11 AM
Description: The Work includes but is not limited to the following: Removal, abatement, cleanup, encapsulation and other methods of managing regulated materials; Saw cutting and core drilling into regulated materials, and the removal of regulated materials during and after such activities.
Regulated materials include but are not limited to asbestos, lead containing paint, PCB caulking, PCB and non-PCB light ballasts, and mold and other biological hazards. Work shall be performed on an on-call basis at various Airport and Seaport locations owned by the Port of Seattle. The areas may also include projects managed by the Port of Seattle in locations not directly owned by the Port of Seattle.
Estimate: Not to exceed $300,000, which includes Washington State Sales Tax.
Pre-Bid Meeting: A Pre-bid meeting will be held June 29, 2021, at 11:00 am, via Microsoft Teams Meeting or Via telephone.

Click here for more information