Port of Seattle – RFB – Telecommunications On-Call Portwide 2021 – SW-0320432 – Due 12/09/20

Port of Seattle – RFB – Telecommunications On-Call Portwide 2021 – SW-0320432

Due Date: December 9, 11 AM
Estimated Amount: not to exceed $300,000.00, which includes Washington State Sales Tax.

The contractor shall provide all labor, materials, equipment, tools and incidentals to perform, and complete telecommunication systems installations. The Work includes but is not limited to the
following:
1. Fiber optic communications, including, but not limited to; cables, patch panels, splice panels, splices and connectors. If SYSTIMAX ™ products are utilized, then they shall be
installed, terminated, tested and documented by a SYSTIMAX ™ Washington Business Partner. The active Business Partner list can be located at the SYSTIMAX ™ webpage by
following the link: www.Commscope.com; Brands; SYSTIMAX™; Support; Partners/Consultants/Alliances; Enterprise Locator (select Country and State).
2. Copper communications, including, but not limited to TIA-568 Category 5 or higher performance cables, patch panels, terminal blocks, and connectors. If SYSTIMAX ™ products are utilized, then they shall be installed, terminated, tested and documented by a SYSTIMAX ™ Washington Business Partner. The active Business Partner list can be located at the SYSTIMAX ™ webpage by following the link: www.Commscope.com; Brands; SYSTIMAX™; Support; Partners/Consultants/Alliances; Enterprise Locator (select Country and State).
3. Testing and labeling is required per Section 27 05 53 – Identification and Labeling.
4. Cost estimating, safety and site visits (non-manual labor) shall be included in the unit prices for the labor categories defined in Document 00 41 00 Bid Form. No separate payment will be allowed for cost estimating, safety and site visits.
5. Work may also include installations of RG-6 Coaxial and Heliax and innerducts often colocated with SYSTIMAX™ Cables in raceways and junction boxes.
6. Should the Contractor lose their active Business Partner status for SYSTIMAX™ any time prior to acceptance of the Work by the Port of Seattle, the Port may terminate the Contractor’s work as to all or any portion of the Work remaining to be performed, and to complete the Work by an Active SYSTIMAX™ Business Partner and recover the costs thereof.