Port of Tacoma – RFB – Administration Building Electric Vehicle Charging Stations – 071755 – Due 6/14/23
Due Date: June 14, 2 PM
Procurement Summary: The Work required for this Project includes: Installation of concrete foundations, transformer vault, bollards, conduit, wiring, and electric vehicle charging stations and connecting them to the existing electrical system infrastructure. The work also includes, selective asphalt demolition and restoration, trenching and other miscellaneous work as described in the project documents.
Estimated Cost Range: Estimated cost range is $500,000 to $600,000, plus Washington State Sales Tax (WSST).