City of Tacoma – RFQ – Fish Passage Facility Upgrade TW24-0018F – Due 3/19/24

Due Date: March 19, 11 AM

Pre-Proposal Meeting: A pre-proposal meeting will not be held.

Project Scope: Tacoma Water intends to award a contract for a fish passage engineering consultant to support and prepare the fish passage facility for full-scale operation. Objectives of the project are prioritized to (1) improve worker safety, (2) reduce fish injury and mortality, and (3) increase the facility’s efficiency with the expectation of a fully-functional fish passage facility.

Estimate: $625,000.00 (For budgetary purposes only).

Click here for more information

Port of Seattle – RFB – 400 Hz Gate Power Boxes for SEA Passenger Loading Bridges 24-01 – Due 3/19/24

Due Date: March 19, 2 PM

Description: The Port is seeking a vendor who can provide 4 of 400 Hz Gate Power Boxes for SEA Passenger Loading Bridges.

Click here for more information

Port of Seattle – Curbside Management Services 23-184 – Due 3/19/24

Due Date: March 19, 2 PM

Description: The Port of Seattle (Port) is soliciting proposals for Curb-side Management Services. The scope of work includes: Queue management and dispatching taxis and flat-rate for hire vehicles from the South 160th Ground Transportation Lot to the 3rd Floor staging area. Verify that all taxis and flat-rate for hire vehicles entering the 3rd Floor staging area are permitted to operate at the Airport. Calling in additional permitted operators if demand exceeds capacity.

Click here for more information

Port of Seattle – RFB – 2024-2025 Tourism Marketing Support Program 24-15 – Due 3/28/24

Due Date: March 28, 2 PM

Description: The Port of Seattle will be accepting applications for 2024-2025 Tourism Marketing Support Program. Applicants are strongly encouraged to register as Plan Holders on this website to receive notifications and updates pertaining to this program. Woman and minority-owned businesses are encouraged to participate.

Click here for more information

City of Tacoma – RFB – Mayfield Cove Lane Culvert & Bank Remediation PG24-0011F – Due 3/19/24

Due Date: March 19, 11 AM

Estimate: $635,000

Pre-Proposal Meeting: A pre-proposal meeting will be held at the Mayfield Project Office, 253 Hydro Lane, Silver Creek, WA 98585, Tuesday February 29, 2024, at 10:00 a.m. This meeting is not mandatory, but bidders are strongly encouraged to attend.

Project Scope: This project will include the supply and construction of a fish-passable replacement ‘bottomless’ Aluminum Box Culvert structure, construction of a segmental concrete block retaining wall system, installation of ~520-feet of 8-inch HDPE waterline, installation of 6” fire hydrant as well as the removal of existing culverts.

Click here for more information

City of Tacoma – RFB – Tank Parts Cleaner Services PW24-0003N – Due 2/21/24

Due Date: February 21, 11 AM

Description: The City of Tacoma seeks parts cleaning tank maintenance, solvent, filters, and fluid servicing, including sundry equipment, supplies and parts, for the period January 15, 2024, through January 15, 2025, with an additional three (3), one-year renewal options, per the attached specifications. All bid pricing shall be FOB Destination, freight prepaid and included in the unit price.

Click here for more information

Flatiron – RFQ – SCWQP: Tunnel Effluent Pump Station – Ballard Conveyance (REBID) PW# 2021-029 – Updated Due 3/27/24

Updated Due Date: March 27, 2 PM

Flatiron is soliciting quotes for the following Divisions and items of work:
For Divisions 01, 02, 03, 05, 06, 07, 08, 09, 10, 11, 14, 21, 22, 23, 26, 27, 28, 31, 32, 33, 34, 40, 41, 43, and 44, including, but not limited to: Shoring/Excavation, Excavation and Handling of Contaminated Material, Grouting, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Lattice Tower System Stainless Steel Framing, Metal Fabrications, Metal Stairs/Railing/Grating, Fiberglass Reinforced Structural Products and Fabrications, Dampproofing and Waterproofing, Firestopping, Hollow Metal Doors and Frames, Floor Access Doors, Overhead Coiling Doors, Glazing, Gypsum Board, Paintings and Coatings, Identification Devices, Panel/Traffic Signage, Fire Extinguishers, Geared Traction Elevators, Fire Protection Systems, Submersible Sump Pumps, Commercial Plumbing Fixtures, Direct-Digital Control System for HVAC, Metal/Fiberglass-Reinforced Plastic (FRP) Ducts, Odor Control Duct Silencer, Electrical – Exterior Underground, Architectural Lighting, Dry-Type Transformers, Motor Control Equipment, Electrical Vehicle Charging Stations, Interior and Exterior Lighting, Fiber Optic Cable Networks, Fire Detection and Alarm, Shoring/Excavation, Dewatering, Stormwater Bypass, Contact Grouting, Aggregate Base, Asphalt/Porous Flexible/Concrete Paving, Fence and Gate, Planting, Microtunneling, FRP Pipe, Railroad Track Construction, Mechanical Piping, Gates/Valves, Control System Equipment, Bridge Cranes, Hoists, Trolleys, and Monorails, Inline Centrifugal Pumps, Drypit Submersible Wastewater Pumps, Fiberglass Reinforced Plastic Tanks, Grease Filter / Mist Eliminator, Activated Carbon Adsorption Odor Control Media, Photographic Documentation, Noise Monitoring, Vibration Monitoring, and Rodent Control and Extermination
Non-DBE Subs/Suppliers: You will be expected to carry a proportionate percentage of 2nd-tier DBE participation with your quote. 2nd-tier DBE participation will be evaluated with your price.

MBE Utilization Requirements 10%, WBE Utilization Requirements 6%

Click Here For More Information

Port of Tacoma – RFB – Banana Yard Rail Switch Upgrade 2024 071940 – Due 3/7/24

Due Date: March 7, 10 AM

Procurement Summary: The Port has been awarded U.S. Department of Transportation Federal Railroad Administration grant in the amount of $2,365,000. In which 58.55% will be applied towards this project.

The Work required for this Project includes but is not limited to: The removal and replacement of fifteen (15) No 9 turnouts; remove and dispose of existing ballast and placement of new ballast under turnouts; furnishing, lining, grading, and compaction of new turnouts and trackwork; removal and replacement of existing paved crossings; coordinate with the Port of Tacoma and Tacoma Rail to complete the work in a phased approach that limits impacts to track outages and traffic.

Estimated Cost Range: Estimated cost range is $2,650,000 to $3,100,000, plus Washington State Sales Tax (WSST)

Click here for more information

City of Tacoma – RFQ – Inspection Service for Lattice Steel Tower and Steel Pole Transmission Structures PT23-0207F – Due 2/27/24

Due Date: February 27, 11 AM

Pre-Proposal Meeting: A pre-proposal meeting will not be held.

Project Scope: Tacoma Public Utilities (TPU) is soliciting proposals from qualified firms to provide Inspection Services for Latticed Steel Transmission Structures and Steel Transmission Pole Structures.

Estimate: $500,000

Click here for more information

Port of Tacoma – RFP – On-Call Grant Support Services 072078 – Due 3/6/24

Due Date: March 6, 2 PM

Procurement Summary: The Port of Tacoma (Port) and The Northwest Seaport Alliance (NWSA) are requesting proposals from one or more consultants interested in providing on-call grant writing/funding application and post-award grant support services in the following, but not limited to, subject areas: Transportation, Air & Water Quality, Energy, Remediation, Climate & Resiliency and Security & Emergency Management. This may include preparing an application in partnership with public and/or private partners or applying and providing post-award grant management support for a joint project, or on behalf of a partner.

Estimated Cost Range: Not to Exceed (NTE) $350,000

Click here for more information